#1: Road Map to Bika Fire Assay 1.0
Contents
- Proposed by
- Joris Goudriaan
- Seconded by
- Lemoene Smit
- Proposal type
- System Requirements
- Assigned to release
- Repository branch
- bikaassay
- State
- ready-for-merge
Definitions
assay - a chemical test performed on a sample of ores or minerals to determine the amount of valuable metals contained. www.miningbasics.com
fluxing - a process used in the heating of metals which may be intended to reduce or eliminate oxidation, confine the products of oxidation, reduce their melting point, and improve fluidity of surface metal layers. www.wmrc.uiuc.edu
atomic absorption spectrometry (AA) instrumental method of determining element concentration by aspirating a sample solution into an acetylene or nitrous-oxide flame and passing light from the same element through the flame.The concentration of the element in the sample can be quantified by the amount of light absorbed by the element present within by the flame. www.acmelab.com
See Glossary in the Documentation section
Motivation
For Mining prospects. Additionally to develop Bika SQL capacity and Unit tests. New modules to be kept modular for inclusion other Bika branches
Assumptions
MSSQL
The LIMS is to reside on an MSQL database, also to 'interface' with other apps in the enterprise running on MS AccessIdeal opportunity to make this move but also attempt to retain ZODB functionality for subsequent roll-outs
Many prospects have expressed requirements to be able to get their hands on data in tabular format. Bika Fire assay will allow for .csv exports from views such as work sheets and query results
Proposal
- Identify and scope new modules and customisations - the gap between Bika 1.2 and proposed Bika Fire Assay 1.0. See Gap analysis Wip
Put proposal and proof of concept presentation together, including
Working LIMS
leading off the wireframe
customised as far possible to GAP analysis
Worst case price guestimate
- Present said proposal to first prospects
- Aquire approval to develop
- Detailed analysis and design
- Development
- Testing
- Acceptance testing
- Production implementation
Implementation
Over 9 month period up to 1 January 2007 - the plan as set out in the proposal section above
Deliverables
Gap Analysis deliverables
Presentationwireframe enterprise shell
fire assay LIMS via schema editor and language files
Progress log
1. Analysis started - 4 April 2006
2. Wire framing starts - 20 April 2006
Participants
Lemoene Smit
Joris Goudriaan
Mining analyst
Anneline Sweetnam
Inus Scheepers
Developers